There are many slave systems in our time, as building systems have advanced and developed, and all governments and companies are competing in the implementation of cities and capitals characterized by safety and development in addition to creativity and innovation. Its interest is limited only to national projects, but it is also concerned with providing safe and efficient housing units worthy of every Saudi citizen or resident in the Kingdom, and this came through the Saudi government's issuance of the Saudi Building Code. No customer is harmed by any defects found hereafter.
How to design sewage systems in different projects
The establishment of a complete project for sewage systems and networks is an important and critical matter as it is no less important than the importance of building the target project to build it from the beginning, and many people may think that sewage systems are only complementary. But in fact, no matter how great the projects and facilities that have been built without the work of sewage networks of high quality and efficiency, the result of these projects will be destruction and devastation for the environment, the investor, the resident or the business owner in this sector, so all the competent authorities are concerned, in addition to the willing In purchasing and investing, ensuring the integrity of infrastructure and sewage systems first before anything else.
Feasibility study of the sewage construction project.
At the start of the sewage project, an accurate feasibility study must be drawn up. This study must include the type and size of the project desired to be built, and thus determine the value of the total cost expected to be needed. It is worth noting that such a project must shed light. To implement it with the highest quality, lowest cost and maximum benefit, and this is the challenge and the desired goal when starting the planning. It is necessary to rely on specialized and experienced people to implement such a project, and the future outlook should be dominant in the design of networks and systems, as the main goal is to obtain a complete sewage system that will last for many years without problems.
Targeted information When designing slave systems,
a set of important data and details must be collected through which the application and cost of the sewage project is determined. The first of this information is the natural location and the place where the project is established and the drainage networks, where the matter is different if the project is in a modern city or In a primitive village, in addition to the presence of factories, dedicated networks need to be established, and all the natural features in that area must be determined to take them into account. When sewage systems are started, four sections of the city are planned:
the areas designated for residents.
Areas designated for industrial activities.
Areas designated for health services.
City transportation stations.
The works required to establish a sewage
project
After the division is carried out,
surveying work is started, which are carried out by specialists, the topographic lifting is started, the sewage pipe networks in the city must be determined, and the most important main facilities that many people go to must also be determined. The locations of the railways, in addition to the main roads in the city, should be clarified, and the specialists determine the type of soil in which the project will be built, and the depth of the groundwater in it should be determined, and this information will result in choosing the type of sewage pipes that will be used in the project.
يجب عليك تسجيل الدخول لتستطيع كتابة تعليق